Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | Wawushan |
Model Number : | XJ-011 |
Price : | negotiable |
Payment Terms : | T/T |
Supply Ability : | 1+unit+4 months |
Delivery Time : | 120 wordking days |
500kw Turgo Hydro Generator For Hydro Power Plant
overview
Turgo turbine compared with tangential impulse or called pelton one has a lot of advantage such as higher specific speed,wide range of application as well as easy match directive driving generator,except wide range of application as well as easy match directive driving generator,except simple of construction, reliable operation,convenience in operation and maintenance etc.
Turgo or inclined-jet implulse turbine is a kind of impluse turbine. its nozzle make the angle of 22.5° with roating palne of the runner. water come from reservoir or forebay enters the nozzle via a penstock and the intake pipe becomes high veloocity jet, then the jet injects the vanes of runner. the water flow enters in the inlet of vane and go out of the vane. the turbine does a work. its output drives a generator via shaft and couipling.
Advantages
Covers the boundary between Francis and Pelton
Limits Over-Pressure Effect over the penstock
Higher speed = weight and cost reduction
Maintains efficiency over a wide flow range
Superior abrasion resistance
Ease of operation and maintenance
Specification
Name | 500kw Turgo water turine Generator |
Water Head | 110.0m |
Runner Diameters | 0.58 m |
Capacity2 | 500KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
our service:
1. The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the
request or Runh Power's recommandation or the request from the
commissioner.
b. Design of overall layout and all the sub-systems within the
parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review
and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler,
condensing water collector, deaerator, high pressure and low
pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other
necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power
plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c. Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by
Runh Power
b. Installation, testing & trail run of all systems of a power
plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.
![]() |