Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | Wawushan |
Model Number : | SF-009 |
Price : | negotiable |
Payment Terms : | T/T |
Supply Ability : | 1+unit+4 months |
Delivery Time : | 180 wordking days |
750kw Water Electricity GeneratorFor Micro Hydro Power Plant
overview
We can supply hydraulic turbines system , hydro turbine system such
as kaplan turbine, propeller turbine, francis turbine and pelton
turbine, turgo turbine and so on, also with speed governor,
generator, valves, excitation system and its other accessories.
In order to guarantee the product quality, the company has advanced
testing instruments and strictly defers to ISO9001 quality
management system.It is strictly controlled the quality in every
process to assure the high level,fineness and no bug of products.
Regardless of size, all turbines are manufactured with only
high-quality components, and undergo rigid quality inspections to
ensure high efficiency and reliable operation.
All of our medium and large hydro generators are engineered to reduce thermo-mechanical stress on the generator structure, which contributes to
improved reliability and extended lifetime. Additionally, our generators come with a stator core pressing system to ensure that pressing force is
provided precisely where it is needed: in the core.
A closed loop air ventilation circuit is standard with our machines and, when necessary for the site conditions and generator
configuration, we offer state-of-the-art cooling systems.
Specification
Name | 750kw water turbine generator |
Capacity2 | 750KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | horizontal |
Material(coil) | copper |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
we supply complete package for hydro power plant
1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the
request or Runh Power's recommandation or the request from the
commissioner.
b. Design of overall layout and all the sub-systems within the
parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review
and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler,
condensing water collector, deaerator, high pressure and low
pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other
necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power
plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b. Regular maintenance and inspection (Optional)
c. Technical Training Program for Power Plant Personnel (Optional)
d. General Overhaul (Optional)
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by
Runh Power
b. Installation, testing & trail run of all systems of a power
plant (Optional)
c. Installation, testing & trail run of entire power plant
(Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(
![]() |