Sign In | Join Free | My burrillandco.com
Home > Water Turbine Parts >

0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

Hongya Power Generating Equipment To Utilities Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator from wholesalers
     
    Buy cheap 0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator from wholesalers
    • Buy cheap 0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator from wholesalers
    • Buy cheap 0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator from wholesalers

    0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

    Ask Lasest Price
    Brand Name : Wawushan
    Price : negotiable
    Payment Terms : T/T
    Supply Ability : 1+unit+4 months
    Delivery Time : 120 wordking days
    • Product Details
    • Company Profile

    0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

    Stainless Steel Water Turbine Parts Turgo Wheel For Generator


    The Turgo wheel is basically an improved version of the Pelton.The maximum efficiency of animpulse wheel is achieved when the velocity of the runners at the centerline of the nozzle is half the velocity of the incoming water. To achieve the highest velocities the ratio of the diameter of the wheel and thediameter to the center of the nozzle should be as small as possible..The wheel has a minimum ratio of 9:1, the Turgo has a minimum ratio of 4:1. The Turgo is half the size of the Pelton and operates at twice thespeed. This makes the unit cheaper and reduces the amount of gearingnecessary. The Turgo has an efficiency of over 80% and runs on head of 40 feet or more.


    specification


    runner materialstainless steel
    runner typeKaplan
    diameter0.8 m
    capacity200kw
    blade No18PCS
    weight400KG

    The package of Project


    a. Verification of documents submitted
    b. Audition of documents by the authority
    c. Signing the contract
    2. Engineering Design
    a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
    b. Design of overall layout and all the sub-systems within the parameter of power plant.
    c. Selection of personnel participating in the project
    d. Submission of technical solution to the commissioner for review and approval.
    3.Equipment Purchase& Transportation
    a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
    b. All the construction material, tools, spare parts and other necessities of the project
    4. Civil Construction
    a. All the civil construction work within the parameter of power plant
    5. Operation & Maintenance
    a. Operation of power plant (technical counseling)
    b.Regular maintenance and inspection
    c.Technical Training Program for Power Plant Personnel
    d.General Overhaul
    6. Installation & Testing
    a.Installation & testing for all systems & equipment provided by Runh Power
    b.Installation, testing & trail run of all systems of a power plant
    c.Installation, testing & trail run of entire power plant
    7. Supply of Spare Parts
    a. Long-term supply of spare parts and other consumibles.


    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hongya Power Generating Equipment To Utilities Limited
    *Subject:
    *Message:
    Characters Remaining: (0/3000)